The Short Answer
After coordinating 200+ rush solar installs in northern Illinois, here's what the data says: a GoodWe 6 kW inverter comfortably handles a typical 8–10 kW DC residential array in Illinois, and a 7.2 kW Level 2 charger adds roughly 25 miles of range per hour — enough to take a 60 kWh EV from empty to full in about 8 to 10 hours. If that's all you came for, you can stop reading. What follows is the reasoning, the numbers I actually see in the field, and where this answer breaks down.
Two clarifications before we go further. First, "miles per hour" for a Level 2 charger is not a fixed spec — it depends on your vehicle's efficiency (kWh per 100 miles) and the charger's amp rating. Second, "how long does a Level 2 charger take" depends on battery size, starting state of charge, and whether the charger is actually pulling its rated current. I break both down below.
Why My Take Is Worth Weighing
I'm the dispatch lead at a solar-plus-electrical contractor outside Chicago. I've handled 200+ rush orders in five years, including same-day turnarounds for homeowners who were moving in the next morning and needed their Level 2 charger live before the moving truck showed up. When I'm triaging a deadline project, I look at three things in order: (1) how many hours we actually have, (2) whether the scope is physically possible in that window, and (3) what the worst-case scenario looks like if a permit or utility interconnection slips.
That's the lens behind every claim below. If something hasn't survived a deadline crunch — a utility rebate audit, a failed inspection, a firmware bug at 9 pm the night before handover — I'm not going to pretend it's a clean story.
GoodWe 6 kW Inverter: What Installers Actually Report
GoodWe inverter reviews tend to split along a predictable line. The hardware — the 6 kW single-phase units, whether grid-tie or hybrid — gets consistently good marks from installers on value and reliability. The complaints cluster around the SEMS monitoring app and occasional firmware hiccups during commissioning. That's been my experience too: the boxes are dependable; the software interface is where most of the friction lives.
The 6 kW class unit is right-sized for a typical Illinois residential system. Illinois homes usually land in the 8–12 kW DC array range, and GoodWe's 6 kW inverter handles 8–10 kW DC comfortably within its 1.5x DC oversizing window. For a standard 18–22 panel array, you're well within spec. If your roof has a split east/west orientation, the two MPPT channels handle different strings without much loss — which matters more in Illinois than in, say, Arizona, because our winters already eat into production.
When I compared a GoodWe 6 kW hybrid install against a comparable premium-brand setup on the same street — same array size, same tilt, same efficiency class — I finally understood why the price gap doesn't always translate into performance. Both hit expected monthly production within 3%. The difference showed up in the app experience and, honestly, in the warranty paperwork. GoodWe's standard 5-year warranty extends to 20 years if you pay for the extension — that's a real cost, not a freebie, so factor it in.
One practical note for Illinois: verify that the exact GoodWe model you're quoting is on your utility's approved inverter list before you order. ComEd and Ameren each maintain their own lists, and an unlisted inverter will sink your interconnection timeline faster than anything else. I've seen this trip up exactly two installs — both were rush jobs where the salesperson quoted before checking.
Illinois Solar: The Net Metering Calculus
If you're building a solar system in Illinois, net metering is still your biggest financial lever. As of early 2025, residential customers on ComEd and Ameren generally retain 1:1 retail net metering — every kWh you export offsets a kWh you import at the full retail rate. That's a better deal than most states, and it's why array sizing in Illinois leans toward annual consumption offset rather than just peak daytime load.
That said — and this is where rush orders get derailed — the rules can shift. Illinois Commerce Commission proceedings, adjustments under the Illinois Shines program, and utility-specific interconnection queues all affect the real timeline. I tell every client the same thing: don't buy based on a rate assumption you haven't confirmed with your utility in writing. The upside of 1:1 net metering I modeled for one client would have been 18% worse under a different rate structure. That's a $2,400 swing on a mid-sized system, and it doesn't show up in any glossy proposal. What I mean is: the savings chart you're shown assumes today's rate holds for 25 years. Ask what happens if it doesn't.
On incentives: Illinois Shines (the Adjustable Block Program) still offers SREC-style payments for qualifying residential installs, though the program has run through several blocks, and current block status matters. Verify program availability before signing — a system installed the week after a block closes is a different financial equation.
Level 2 Chargers: Miles Per Hour and Time to Charge
Now the numbers most homeowners actually want. A Level 2 charger runs on 240V and adds range far faster than a standard 120V outlet. The exact rate depends on the charger's amperage and your car's efficiency:
- 32A unit (~7.7 kW): roughly 25 miles of range per hour. This is the sweet spot for most Illinois homes with 100A or 200A service.
- 40A unit (~9.6 kW): roughly 30–35 miles per hour.
- 48A unit (~11.5 kW): roughly 35–42 miles per hour, assuming your vehicle and panel support it.
Those ranges assume roughly 3 to 3.5 miles per kWh of battery capacity — the average efficiency of most modern EVs. When I compared our actual charging logs across 40+ customer vehicles, the 7.2 kW charger consistently delivered about 24–27 miles per hour, with Illinois winter temperatures knocking that down 10–15% on the coldest days.
So how long does a Level 2 charger take to fill a car? Real examples from our installs:
- A 60 kWh battery at 7.2 kW: about 8–10 hours from empty.
- A 75 kWh battery at 7.2 kW: about 10–12 hours.
- A 40 kWh smaller-battery EV at 7.2 kW: about 6–7 hours.
- A 75 kWh battery at 11.5 kW: about 7–8.5 hours.
Those numbers assume about 90% charging efficiency, which is realistic for residential AC charging. In practice, most drivers don't charge from empty — they top up overnight. For a 40–50 mile daily commute, a 7.2 kW charger puts you back to full in roughly 2 hours. That's the number that matters to 90% of Illinois commuters, and it's the one that rarely shows up in the marketing materials.
A quick note on the GoodWe 6 kW inverter relationship here: in a standard grid-tied setup, the inverter doesn't directly power the Level 2 charger — the charger pulls from the grid while the inverter handles solar production. But if you're going hybrid with a battery, the inverter's efficiency and battery management absolutely affect how much of your charging can come from stored solar. That's where system-level design matters more than the individual spec sheet.
The Quality Bar Nobody Puts in the Proposal
The thing that changed my view on system quality wasn't a spec test. It was a client comment from a project where I nearly rushed through a cheaper inverter choice. When I switched from a budget pick to a solid mid-tier option on a 2023 install, the client's first-week feedback — the app, the labeling, the clean conduit run — changed how they referred us to neighbors. Client feedback scores on those projects improved noticeably, and the difference wasn't the price tag. It was the perception that we'd done it properly.
The $200–$300 difference per project translated into referrals worth far more. That's the honest math. Even after we swapped to the mid-tier inverter, I kept second-guessing myself — what if the quieter voice in the proposal was right and we were overengineering? Didn't fully relax until the first monthly production report came in and the app data looked clean. It did.
When This Advice Doesn't Apply
Three boundaries, stated plainly. First, if your array is over 12 kW DC, a 6 kW inverter is the wrong piece of equipment — you'll need to step up to a 7.6 kW or 10 kW class unit, or a multi-inverter setup. Second, if your panel is a 100A service with limited spare capacity, a 48A Level 2 charger isn't safely feasible without a panel upgrade; plan for the extra cost and time. Third, if you're on a utility outside ComEd or Ameren — which includes a lot of Illinois co-ops and municipal utilities — the net metering structure is likely different, and the ROI math changes materially. Get the interconnection rules in writing before you sign anything.
And a caveat on the charging numbers: every vehicle's efficiency curve is different, and Illinois winters below 20°F will reduce both charging speed and range. I want to say we see about a 15% reduction on the worst days, though I might be misremembering the exact figure from our January logs. Assume 10–20% and you'll be safe.
Look — most people I help don't need the perfect system. They need a system that's right-sized, permitted correctly, and commissioned before life moves on. The GoodWe 6 kW, a properly matched Level 2 charger, and honest net metering math get you there more often than not. Not because they're the cheapest option out there, but because they hold up when the schedule slips and the client is watching.